Reserve Lodging Facility

This project included entirely demolishing and removing two buildings to construct 38 guest rooms in three stories, and it achieved LEED Gold. The project utilized a rigorous quality assurance/quality control protocol closely monitored by the United States Army Corps of Engineers.

The scope of work included: concrete slab-on-grade; brick veneer on insulated concrete form thermal envelope; exterior insulation and finish system; standing seam metal roof; light gage roof trusses; steel joists with metal deck and concrete floors; gypsum and other interior finishes; blast resistant, super efficient, acoustically enhanced, insulating glass window units with laminated glass; eco-disc elevator; high efficiency 4 pipe HVAC system; and energy efficient lighting package.

For more information about this project, click here

Back to Green Building Home

 


Sota Construction Services Inc. is an Equal Opportunity Employer.